Skip to main content
A starting point for your project

Mandi / aadhat godown design 15 × 30 m starting form

Keep trading, weighing and dispatch in view. This three-sided mandi or aadhat godown opens the front cladding and places produce tables, weighing space and pallet staging around a central movement reserve.

यह जानकारी हिंदी में पढ़ें
Furnished mandi / aadhat godown 3D concept showing the frame and illustrative interior equipmentFURNISHED CONCEPT
Illustrative preset preview. Current starting inputs are listed below; inspect changes in the live editor.
Floor footprint
450 m²15 × 30 m width × length
Eave height
5 mCheck actual underside clearance
Bays along the length
5 bays6.00 m centre-to-centre
Wall arrangement
Three sides clad · open frontStructural members remain at openings
Same footprint. Three bay arrangements.

See what changes the steel quantity.

The range compares 4, 5, 6 bays at the same width, length, eave, roof, openings and selected sections. It describes those modelled arrangements; it is not an engineered minimum–maximum allowance.

30.2–35.2kg/m² of floor footprint
2.81–3.27kg/sq ft of floor footprint

Concept take-off, sections not designed — run the section sizing screen

Starting 5-bay model: 14,704 kg of modelled steel.

See exact scenarios and quantity basis
BaysBay spacing (m)Model steel (kg)kg/m²kg/sq ft
47.5013,61030.242.810
5starting6.0014,70432.673.036
65.0015,84535.213.271

Primary / secondary / brace sections: BSP MB 300 × 140 · MC 100 × 50 · ISA 75 × 75 × 6

End-wall framing is enabled, matching a fresh editor preset; modelled end posts are included where walls are clad. This is net frame, secondary-member and plate mass. Procurement waste, cladding, civil works, furnishings and equipment loads remain separate. No price, safe capacity or design approval is inferred.

More than an empty shell

A furnished starting layout.

The current fit-out generator places 17 physical objects in this starting model. These counts come from that generated layout.

  • 2
    Sorting / wash tableProduce inspection table
  • 1
    Workshop benchWeighing / transaction counter
  • 5
    Palletised goodsProduce handling pallet · Produce staging pallet
  • 1
    Office deskDesk
  • 1
    Office chairChair
  • 1
    Storage cabinetRecords cabinet
  • 4
    Linear light fixtureGeneral light
  • 2
    Extinguisher positionFire equipment position (review required)

The 3.0 m central stripe is a planning reserve, not an approved exit route or vehicle swept-path result. Equipment is generic; confirm capacity, service clearances and actual loads separately.

Before you build your brief

Questions, answered.

A closer look at the mandi / aadhat godown concept, its editable inputs and the decisions that belong in a project-specific design.

What are the starting dimensions of the mandi / aadhat godown?

The preset starts at 15 m wide by 30 m long, with a 5 m eave and 5 bays along its length. You can edit these dimensions. They describe a concept starting form, not an operating capacity or approved structural design.

Does the open front guarantee truck clearance?

It removes the front end cladding only. Columns, bracing and other framing remain; check actual vehicle dimensions, turning space and the frame opening before planning loading access.

Can I separate different commodities in the mandi?

Use the editable tables, pallets, cabinets and floor zones to discuss segregation. Confirm handling, hygiene, moisture control and commodity-specific storage requirements in the operational brief.

Is a raised loading platform included?

The starting mandi layout has no designed loading platform. Linked dock geometry can be added in the editor, then coordinated with the yard level, drainage, vehicle approach and platform structure.

How do I plan rain protection at the open front?

Review roof overhangs, optional canopy geometry, gutter discharge and wind-driven rain exposure for the actual site. Visible roof and drainage details do not establish a designed weatherproofing system.

Explore another starting point
View all 20 concepts

Make this starting point your own.

Adjust the dimensions, roof, enclosure and equipment layout. Keep refining the actual project brief and engineering inputs alongside the model.

Start in 3D