Oil mill shed design 15 × 30 m starting form
Plan oilseed intake, pressing, vessel space and filling within one enclosed shed. The generic process arrangement is a starting point for coordinating machinery envelopes and the movement of raw and packed material.
FURNISHED CONCEPT- Floor footprint
- 450 m²15 × 30 m width × length
- Eave height
- 6 mCheck actual underside clearance
- Bays along the length
- 6 bays5.00 m centre-to-centre
- Wall arrangement
- Enclosed perimeterStructural members remain at openings
See what changes the steel quantity.
The range compares 5, 6, 7 bays at the same width, length, eave, roof, openings and selected sections. It describes those modelled arrangements; it is not an engineered minimum–maximum allowance.
Concept take-off, sections not designed — run the section sizing screen
Starting 6-bay model: 18,012 kg of modelled steel.
See exact scenarios and quantity basis
| Bays | Bay spacing (m) | Model steel (kg) | kg/m² | kg/sq ft |
|---|---|---|---|---|
| 5 | 6.00 | 16,775 | 37.28 | 3.463 |
| 6starting | 5.00 | 18,012 | 40.03 | 3.719 |
| 7 | 4.29 | 19,274 | 42.83 | 3.979 |
Primary / secondary / brace sections: BSP MB 300 × 140 · MC 100 × 50 · ISA 75 × 75 × 6
End-wall framing is enabled, matching a fresh editor preset; modelled end posts are included where walls are clad. This is net frame, secondary-member and plate mass. Procurement waste, cladding, civil works, furnishings and equipment loads remain separate. No price, safe capacity or design approval is inferred.
A furnished starting layout.
The current fit-out generator places 17 physical objects in this starting model. These counts come from that generated layout.
- 1Feed / grain hopperOilseed intake hopper
- 1Processing machinePress equipment envelope
- 2Process tankIntermediate vessel · Finished-product vessel
- 1ConveyorMaterial conveyor
- 1Bagging stationFilling equipment envelope
- 3Palletised goodsPacked-product pallet
- 1Storage cabinetTools and records cabinet
- 4Linear light fixtureGeneral light
- 2Extinguisher positionFire equipment position (review required)
- 1Prefab door assemblyFront entry assembly
The 2.4 m central stripe is a planning reserve, not an approved exit route or vehicle swept-path result. Equipment is generic; confirm capacity, service clearances and actual loads separately.
Questions, answered.
A closer look at the oil mill shed concept, its editable inputs and the decisions that belong in a project-specific design.
What are the starting dimensions of the oil mill shed?
The preset starts at 15 m wide by 30 m long, with a 6 m eave and 6 bays along its length. You can edit these dimensions. They describe a concept starting form, not an operating capacity or approved structural design.
What kind of oil mill does the model represent?
It is a generic spatial concept with intake, a press envelope, vessels and a filling area. It does not select an extraction technology, product, throughput or equipment supplier.
Are process-vessel supports included in the frame design?
The visible vessels do not add structural loads automatically. Provide operating and empty weights, support reactions, anchor arrangements and maintenance actions for separate design.
Does the shed design cover fire and spill control?
No process hazard, spill containment or fire-system design is generated. Define the actual materials and operation so the relevant specialists can determine the required provisions.
Can I expand oilseed or finished-product storage?
You can move or add generic pallet and rack objects in the editor. Review commodity segregation, loading access, storage actions and services before treating an expanded arrangement as an operating layout.
Related shed concepts.
Make this starting point your own.
Adjust the dimensions, roof, enclosure and equipment layout. Keep refining the actual project brief and engineering inputs alongside the model.


